Aquaman Splashdown (Update 6)

The demolition of Aquaman Splashdown continues at a rapid pace. The ride’s lift hill has been deconstructed, along with the bottom of the main drop. The trough that once held water for the attraction has been transformed into a pile of dirt and debris.

Read More
Aquaman Splashdown (Update 5), Gold River Adventure (Update 3)

Demolition of Aquaman Splashdown continues as the ride’s station and exit splash bridge are now removed. Retro signage teasing a 2020 attraction are also now visible. Six Flags has placed new walls around various parts of Gold River Adventure.

Read More
Aquaman Splashdown (Update 4)

Extensive construction walls have been placed around the perimeter of Aquaman Splashdown. The pathway from Majestic Theatre to Bugs Bunny Boomtown has been closed off, also ceasing operation of Cloud Bouncer and the Six Flags Railroad.

Read More
2019, AquamanSF Source
El Diablo (Update 6), Gold River Adventure (Update 2) & Aquaman Splashdown (Update 3)

Work on El Diablo’s queue line is in full swing as footers have been poured and polls for a future shade structure are going into place. More signage and theming has also been removed from Gold River Adventure.

Read More
El Diablo (Update 1) & New Dining Locations

We visit Six Flags Over Texas on a rainy day to see the beginning stages of El Diablo construction as well as progress on the all-new Chop Six and Smith Street Ice Cream Parlor locations.

Read More