Aquaman: Power Wave Construction Tour (Update 10)

Construction has picked back up on Aquaman: Power Wave.

Staring towards the future area of the ride’s final splashdown.

The coaster’s station area has been carefully deconstructed.

Late design changes will add a turntable for two-boat operations.

Aquaman: Power Wave required additional support now that a portion of track is missing.

Aquaman: Power Wave features a smaller airtime hill in its track layout.

Additional land has been cleared for the ride’s entrance, queue and retention pond.

Additional foliage has been removed to make way for the updated turntable design.

This area will soon hold the attraction’s water for the finale splashdown.

Aquaman: Power Wave is set to feature a partially-indoor, more immersive queue experience.

Aquaman: Power Wave is scheduled to open late summer of 2022.